Holcim and mineral‑mineralisation company 44.01 launch a pioneering pilot in Fujairah, capturing CO2 directly from cement production and storing it permanently underground, marking a significant step towards industrial decarbonisation on a global scale.
Holcim and carbon‑mineralisation company 44.01 have begun a pilot in Fujairah that, the partners say, is the first to combine CO2 captured directly from a cement plant with in‑situ mineralisation aimed at permanent geological storage of cement‑sector emissions.
According to the original report, the initiative will initially capture about 5 tonnes of process CO2 per day from cement production at Holcim’s Fujairah facility and inject it into suitable underground rock formations where the gas is expected to mineralise. The partners describe the method as a “natural, safe and permanent” form of carbon storage and say the site will act as a demonstration for technologies that could be replicated across Holcim’s regional and international assets as part of the group’s NextGen Growth 2030 strategy.
The project is supported by the Fujairah Natural Resources Corporation (FNRC) and delivered with NT Energies, a joint venture between Technip Energies and NMDC Energy. Shell CANSOLV™ carbon capture solutions will be supplied through the alliance between Shell Catalysts & Technologies and Technip Energies. For 44.01, the deployment marks its first collaboration with an industrial customer and a European multinational, and the company views the pilot as a step toward commercial and eventually gigaton‑scale mineralisation applications.
The announcement sits within a broader push in the UAE to commercialise rock‑forming mineralisation. Industry reporting and company statements show that 44.01 has previously worked with ADNOC, FNRC and Masdar on a Fujairah pilot that, according to ADNOC’s press release, permanently mineralised 10 tonnes of CO2 in under 100 days. ADNOC and 44.01 said they plan to scale that work, with a first phase aimed at injecting more than 300 tonnes of CO2 to demonstrate deployability at greater scale.
The Holcim‑led pilot therefore brings a distinct operational element: capturing CO2 directly from cement process emissions rather than from air or other sources before injection. Talal Hasan, chief executive of 44.01, said to GlobalCement, “Working with Holcim, FNRC and NT Energies, we are demonstrating a practical and scalable path to decarbonisation that can be replicated worldwide.”
Project partners argue the initiative illustrates how collaboration between industry, technology developers and local authorities can advance decarbonisation in hard‑to‑abate sectors while contributing to the UAE’s Net Zero 2050 strategy. Holcim has framed the site as a demonstration platform for low‑carbon, circular and carbon‑capture technologies it intends to scale across its operations.
For industrial decarbonisation audiences, the Fujairah pilot highlights two converging trends: first, the move from lab and pilot demonstrations toward integrated, asset‑level deployments that join capture and permanent storage; and second, the importance of geological context and permitting pathways in enabling mineralisation projects. The prior ADNOC‑44.01 work in Fujairah underlines that peridotite and similar ultramafic formations can rapidly lock CO2 into stable carbonate minerals , an outcome proponents say reduces long‑term leakage risk compared with other storage forms. ADNOC’s public statements characterise the earlier pilot as a success and have signalled intent to scale.
At the same time, industry observers note that scaling mineralisation to meaningful volumes for the cement sector will require resolving questions around continuous CO2 capture at plant scale, the matching of capture and injection rates to subsurface capacity, monitoring and verification protocols, regulatory frameworks for pore‑space use, and the cost and energy balance of the full chain. The Holcim‑44.01 pilot, backed by technology suppliers and local authorities, is positioned to address some of those technical and commercial uncertainties by testing capture, transport and injection together in an industrial setting.
The partners say the project will offer data and operational learning to inform replication across cement assets and to support 44.01’s pipeline of mineralisation projects in other markets. The company and its collaborators present the Fujairah work as part of a coordinated pathway to deploy permanent carbon storage solutions in alignment with national decarbonisation targets; however, they frame projected benefits as contingent on successful scale‑up and wider industry adoption.

