Despite current shortfalls in project pipelines, new analysis suggests the U.S. and Europe remain on track to hit their 2030 solar deployment goals, contingent on accelerating storage deployment and consistent policy support.
According to a new McKinsey report, the United States and Europe remain on track to hit their solar deployment goals for 2030 despite current project pipelines falling short of those end‑of‑decade targets. The consulting firm’s analysis of solar, wind and battery energy storage system (BESS) development shows a shortfall today of roughly 254 GW for the U.S. and about 275 GW for Europe relative to the targets those regions set for 2030. China, by contrast, has already exceeded its 2030 solar objective by a wide margin.
McKinsey’s assessment highlights why the U.S. and Europe can still plausibly close the gap before 2030: solar capacity is relatively quick and inexpensive to site and construct, and much deployment , notably rooftop installations , can occur outside the announced project pipeline. “While it is easier to track project build‑out for other clean energy technologies, data visibility for solar is more limited due to individual household use and ease of build‑out,” the report notes. “For example, a consumer can install household solar in two months. This means that the announced capacity may be underestimated in this analysis.”
Industry sources and McKinsey model runs show the present public pipelines underestimate likely additions by roughly 205 GW in the U.S. and 181 GW in Europe; the firm therefore judges further deployment is achievable if economic conditions remain favourable. Diego Hernandez Diaz, a partner at McKinsey, told pv magazine that continued growth will come both from core markets and from less saturated European countries such as Poland, where projects can offer a stronger commercial proposition. “The advantage of some of these elements is that the more nascent markets can have a better economic trade off and can be built in an economically pragmatic way,” he said.
That upside is not guaranteed. McKinsey flags a number of risks that could slow momentum, including supply‑chain constraints, tariff actions, shifting policy priorities and heightened political uncertainty. Hernandez Diaz also warned of regulatory churn. “Perhaps more importantly, however, is that beyond any regulation, what we continue to see is that if the underlying economics work, then deployment accelerates,” he said. The implication for industrial decarbonisation players is clear: predictable merchant returns and stable policy frameworks will be decisive in unlocking the latent pipeline.
BESS emerges as the principal structural uncertainty. McKinsey finds storage pipelines growing fast across China, the U.S. and Europe but still materially behind what is required to meet 2030 ambitions: the firm estimates an additional 123 GW of storage is needed in China, 154 GW in the U.S. and 221 GW in Europe. The report observes that, unlike slower large‑scale thermal or CCUS projects, batteries can be sited, permitted and interconnected relatively rapidly, and that their business case has strengthened when co‑located with solar. “Load balancing is also becoming a popular source of revenue for battery operators,” McKinsey states, adding that integrating BESS into renewable rollout plans is critical if 2030 net‑zero targets are to be met.
The global context sharpens the contrast. McKinsey’s broader analyses and outside reporting underscore China’s dominant role: Chinese deployment accounted for nearly two‑thirds of global additions in solar and wind since 2022 and rose to roughly three‑quarters in the first half of 2025, driven by rapid utility‑scale builds, ultra‑high‑voltage transmission investments and large‑scale storage rollouts. National industrial scale and policy continuity have let China surge ahead, while the U.S. and Europe have faced slower year‑on‑year growth and uneven pipeline firmness. According to McKinsey, Europe must increase annual solar and wind additions by two‑ to five‑fold from 2020–2022 levels to stay on course with its REPowerEU ambitions; that requires scaling annual PV additions from roughly 30 GW to around 70 GW.
For businesses engaged in industrial decarbonisation, the report underlines two operational imperatives. First, accelerate project‑and‑supply‑chain readiness so that commercially viable projects can be delivered rapidly when market signals permit. Second, align investment strategies with the growing need for co‑located storage capacity and for flexible grid planning that values system services. Government measures that reduce permitting friction, underwrite long‑dated offtake or incentivise domestic component supply would materially lower project risk and help turn the implied deployment potential into realised capacity.
In sum, McKinsey presents a cautiously optimistic view: the technical and commercial pathways exist for the U.S. and Europe to meet their 2030 solar targets, but doing so will depend on persistent favourable economics, faster storage deployment and steady policy support , a combination that will determine the pace of industrial decarbonisation through the remainder of the decade.