The Building to Electrification Coalition releases a comprehensive plan aiming to decarbonise BC’s buildings, projected to cut emissions by 75 per cent over the next three decades.
The Building to Electrification Coalition has published a new roadmap for British Columbia that sets out how the province could accelerate the shift to high-efficiency electric buildings and cut building-sector emissions sharply by mid-century.
The 2026 BC Building Electrification Roadmap, known as BERM, was developed after engagement with 200 stakeholders and reflects input from a coalition of 260 organisations across the province’s building ecosystem. Those groups include property owners, green builders, lenders, local governments and other industry participants, according to the coalition.
Backed by the Zero Emissions Innovation Centre, which is part of the Low Carbon Cities Canada network, the plan is framed as a practical guide for electrifying space and water heating in both new and existing buildings. It brings together several strategies and 30 actions, including better collection and use of energy data, continued workforce training, more progress on the Zero Carbon Step Code in line with industry capacity, incentives to reduce upfront electrification costs and tighter standards to ensure only the most efficient heating and cooling equipment is sold.
The coalition says the roadmap, if fully carried out, could reduce British Columbia’s annual carbon emissions by about 75 per cent by 2050, from 9.7 megatonnes to 2.6 megatonnes.
The Zero Emissions Innovation Centre, a charitable organisation established with federal support and operating within the Low Carbon Cities Canada network, focuses on urban decarbonisation and market transformation in the building, transport and renewable energy sectors. Its building programme, ZEBx, is aimed at building knowledge and capacity around zero-emissions construction in Vancouver and across British Columbia.
The release of BERM comes as governments and industry groups across North America continue to look for ways to scale building electrification without running ahead of supply chains, labour availability or financing capacity. For industrial decarbonisation professionals, the roadmap’s emphasis on data, skills and capital constraints underlines a familiar challenge: emissions cuts in buildings depend not only on technology, but also on the institutions and market structures needed to deploy it at scale.
The coalition will host a free online learning webinar on BERM on May 12, 2026, at 12 p.m. PDT.

