Wienerberger’s Uttendorf plant has operationalised the world’s largest industrial electric kiln, slashing CO₂ emissions by up to 75% and setting new standards for sustainable construction materials worldwide.
At the Wienerberger production site in Uttendorf, Austria, a significant milestone in industrial decarbonisation has been achieved with the operation of the world’s largest industrial electric kiln for brick manufacturing. Now one year in operation, this pioneering technology has demonstrated a remarkable reduction in carbon dioxide emissions, cutting them by up to 75% for the production of Hintermauer bricks, translating into annual savings of approximately 7,000 tonnes of CO₂. This achievement equates to the environmental benefit of removing the equivalent of about 600 car journeys around the Earth each year and also reduces the energy consumption at the site by one third.
This advance is the result of an integrated approach combining an electrified firing process, the use of heat pumps, optimised drying methods, and sourcing 100% renewable electricity. The plant, revamped at a cost of €30 million, aims to reduce energy consumption for brick production to under 200 kilowatt-hours per tonne. According to company information, this reflects a transformative shift in the traditionally energy-intensive ceramics sector, reinforcing the essential role of electrification and renewables in industrial decarbonisation strategies.
Central to this environmental innovation is the Porotherm 25-38 Plan E brick, fully manufactured at this plant since late 2024 using only renewable electricity and with a substantially reduced carbon footprint. The ‘E’ in its name notably signifies its electrified production process. Designed for robust construction, the brick is suitable for exterior walls with supplementary insulation, as well as load-bearing interior walls, meeting both structural and sustainability demands. Early adopters of the Plan E brick include projects such as a kindergarten in the Kremser district of Weinzierl and a residential development comprising seven duplexes and a single-family home in Mattersburg, Burgenland.
Wienerberger’s claim that this product sets new ecological and sustainability standards is supported by its engineering specifications and applications, which align with contemporary sustainability goals in the construction industry. The Plan E brick offers durable performance while addressing the growing market need for building materials with reduced environmental impact, especially relevant to energy-efficient and low-carbon building practices.
Furthermore, the success of this technology is emblematic of broader industrial trends aimed at reducing reliance on fossil fuels by integrating advanced electric heating systems and renewable energy in high-temperature industrial processes. This method effectively replaces traditional fossil-fuel-fired kilns, which historically have been a significant source of greenhouse gas emissions within the construction materials sector.
For industrial decarbonisation professionals, the Uttendorf project presents a compelling case study in marrying capital investment with operational sustainability in the building materials industry. It illustrates how targeted process innovation, combined with renewable energy adoption, can yield substantial emissions reductions without compromising product quality or production capacity. The potential to replicate such models across similar manufacturing processes globally poses a crucial opportunity for scaling carbon reductions within heavy industry, consistent with broader climate targets.
In essence, Wienerberger’s Uttendorf facility exemplifies how embracing cutting-edge technology in traditional manufacturing can drive effective industrial decarbonisation, offering valuable insights for companies and policymakers focused on enabling a net-zero industrial future.

